Level Crossing Upgrades

 

 

Onrail has been involved in a number of level crossing upgrade for both ARTC and Sydney Trains.

 

Our most recent job was within Sydney Train's Hornsby Maintenance Centre, where an existing level crossing within a timber turnout was removed, the turnout refurbished and the level crossing replaced. This job was completed during a 2 day weekend possession. This job was delivered ontime and on budget and exceeded our clients expectations.

 

During a 3 day possession of the ARTC's Main North Line, Onrail removed and replaced a level crossing at Muswellbrook. This crossing was heavily degraded and in urgent need of repair. The scope included removal of the exisiting crossing, recondition the track formation, replace the track, install track drainage and replace the level crossing. This scope was also completed ontime and on budget whilst the site was required to continue to provide access through the rail corridor throughout the works.  

 

 

WP_20141117_008.jpg

HMC Before

PC132657.JPG

HMC Construction 1

PC142693.JPG

HMC Construction 2

PC142711.JPG

HMC After

PC142709.JPG

HMC After - Reverse Angle

LevelCrossing1.jpg
LevelCrossing2.jpg
LevelCrossing3.jpg
LevelCrossing4.jpg